... 3施工导流 Diversion during construction 4主体工程施工 Construction of main structures 5施工工厂设施及施工机械 Construction plants and machinery ...
基于1个网页-相关网页
This paper introduces the revision and main revised contents of the national code for construction and acceptance of concrete building structures.
本文主要介绍《混凝土结构工程施工及验收规范》的修订情况及主要修改内容。
Bolted end-plate connection is one of the main connection for the steel structures, which is with high resistance ability, large stiffness, and convenient for construction.
高强度螺栓端板连接是钢结构连接的主要方式之一,具有施工方便、承载力高、连接刚度大等特点。
The interspaces of shield tail is a main reason for the deformation of soil mass and adjacent structures owing to shield tunnel construction.
盾尾空隙的存在是盾构法隧道施工引起土体变形的重要原因.而土体的变形又会对邻近结构产生影响。
应用推荐