According to different construction tools, according to the instructions specified interval and re-painted to ensure quality of coating film thickness.
根据不同施工工具,按说明书规定的重涂间隔及涂膜厚度保证涂装质量。
The interval of the coating time is determined by the temperature at the time of construction and the degree of curing of the film (by hand).
重涂时间的间隔,由施工时的温度和涂膜固化的程度(以手触不粘)来确定。
Article 45. The construction height, face width and landscape control shall meet the following requirements and meanwhile the requirements of sunshine, building interval and fire protection etc.
第四十五条建筑物的高度、面宽及建筑景观控制应符合本章的规定,并同时符合日照、建筑间距、消防等方面的要求。
应用推荐