Construction of Precast Box Beam 预制箱梁施工
construction scheme of box beam 箱梁施工方案
In order to ensure the normal operation of traffic in construction the continuous box beam 's construction adopts cross beam as supporting system and Bailey member bars as abutments.
为保证在施工期间的交通正常运行,连续梁的施工特采取贝雷杆件组拼支墩和横梁作为支撑系统。
This article gives the construction procedure and instructions for on-site casting of continuous concrete box beam with mobile mould.
介绍移动模架施工现浇混凝土连续箱梁的施工工艺,以及在施工中应该注意的事项。
This paper introduces the structure and prestressing system design of Melovue Bridge and its overall design, structure inner stress analysis and construction procedure of box beam.
文章介绍了麦罗维友谊大桥的构造和预应力体系设计,并对该桥的总体设计、结构内力分析以及箱梁施工程序等方面进行了介绍。
应用推荐