以上来源于: WordNet
Treatment of early age concrete poured before earthquake is necessary condition for continuing construction in process after earthquake.
地震前已浇筑的未达龄期混凝土的处置是地震后在建工程项目复工的必要条件。
The Construction phase is in some sense a manufacturing process, where emphasis is placed on managing resources and controlling operations to optimize costs, schedules, and quality.
构建阶段在某种意义上说是一个制造过程,在此阶段要强调对资源的管理和对操作的控制,用来优化成本、进度和质量。
As in RUP, the construction of the use-case model is central to our reverse-engineering process.
如同在RUP中一样,用例模型的构造对我们的逆向工程过程是重要的。
应用推荐