The control of girder geometry and internal forces is very important in the construction of pre-stressed concrete cable-stayed Bridges.
在预应力混凝土斜拉桥的施工过程中对主梁线形与结构内力的控制非常重要。
In this paper, the erection schemes, principal construction techniques for the steel tube arch and geometry control during erection of the arch of the Bridge are presented.
介绍大桥钢管拱的安装方案、主要施工技术以及施工过程中的线形控制。
An all-stage self adaptive geometry control method was used in the construction process.
几何控制法存在众多优点,在斜拉桥施工控制中应用越来越广泛。
应用推荐