During concrete winter construction, the hydration heat of cement can be made use of as a sort of energy.
在冬季混凝土施工中,水泥的水化热是一项可以利用的能源。
For the construction during the winter and rainy seasons, corresponding methods and preventive measures should be planned to guarantee the project quantity while speeding up the progress.
针对冬、雨季的施工,应制定相应的施工方法和预防措施,确保工程质量和施工进度。
This paper introduces the construction method for extension of caissons in winter during the rehabilitation of the container berth in the west port basin in Qinhuangdao port.
介绍秦皇岛港西港区集装箱泊位改造工程沉箱接高冬期施工工艺。
应用推荐