The construction diversion tunnel of a foreign project has special geologic conditions with various developed structural planes.
国外某水利水电工程施工导流洞工程的地质条件十分特殊,各种地质结构面超常发育。
This paper researched the feasibility of using construction diversion tunnel to optimize the figure of tail surge tank by model test.
通过模型试验研究了利用施工导流洞优化尾水调压室体型的可行性。
Then, in accordance with the practice of a diversion tunnel for a certain hydropower station, the whole procedure consisting of construction, operation and plugging has been analyzed.
结合某水电站导流隧洞的工程实例,进行了施工、运行和封堵全过程仿真分析。
应用推荐