Semi-rigid base can't reach the designed strength just after its finished, so the checking value of construction deflection can't be calculated by designed age strength.
刚完工的半刚性基层材料不能达到设计龄期时的强度,以致于半刚性基层顶面施工弯沉检验值不能按设计龄期的强度计算。
This method was used on the Maogang River Bridge construction, resulting in a final deflection differing by 2cm from the design value.
泖港大桥应用此法进行控制,其最终挠度与设计值仅差2厘米。
The deflection value reckoned in its effect in construction wit…
此项挠度值在施工中以实测的温度变形速度计入其影响。
应用推荐