In the construction of the project database module, the thesis has carried on the detailed decomposition to a construction cost report, mainly from the Angle of construction cost analysis.
在构建项目数据库的模块中,本文主要从造价分析的角度,对一份造价报告书进行了详细的分解。
By simulating analysis, the optimal parameters, Numbers and type of construction machinery can be obtained, and the smallest cost and shortest period of construction projects can be predicted.
通过仿真分析,可以对施工机械的机型、数量以及作业参数作出最佳选择,并且预测出施工的最短工期和最低施工费用。
The paper analyses the concept and the role of "four calculation", and compares item cost analysis of construction enterprise with general cost analysis.
介绍四算的概念、作用及项目施工企业成本分析与一般成本分析的比较。
应用推荐