Through curtain grouting construction and analysis of grouting results, the quality of curtain grouting has been analysised objectively.
通过对帷幕灌浆施工和对灌浆成果的分析,对帷幕灌浆的质量进行了客观评价。
Result Design requirements for entering oil-bearing formation (5-8m in thickness ) can be achieved through elaborate construction and analysis without MWD and the like.
结果在无MWD等随钻测井仪器的条件下,可保证在油层厚度仅为5~8 m时准确入靶,并使油层钻遇率达到设计要求。
Based on the design of 12v280zj diesel engine frame this paper pay much attention to present the construction and analysis method and its parameterization design method.
本文围绕12 V 2 80zj型柴油机机体的设计,着重介绍了该机体的结构和分析方法及其参数化的设计手段。
应用推荐