Based on it, the concrete application of the derivation constraint optimization method of multi-flow heat exchanger network is analyzed and discussed.
在此基础上,重点分析和讨论了多股流换热器网络的衍生约束优化方法的具体运用。
Based on the cable-stayed bridge using method of cantilever, the paper establishes the optimization model of construction phase with multi-objective and multi-constraint and gives the example.
采用多目标、多约束的优化方法,以悬臂施工主梁的斜拉桥为例,建立了施工阶段的优化模型,并给出算例。
The optimistic results show the model, constraint conditions and optimization method mentioned in this paper are effective.
实测数据的优化结果表明本文所提出的模型、约束条件和优化方法是有效的。
应用推荐