connected pipe test 地面联管试验
Seal the blind plate and check carefully whether the pipeline is correctly connected and block phenomenon in the pipe before pressure test.
试压前要先封好盲板,认真检查管路是否连接正确,有无管内堵死现象。
The wave force on the steel-pipe pile which was connected and unconnected to the test platform was tested; and the acceleration versus time data and natural vibration frequency were obtained.
对波流力作用下连接及未连接平台的钢管桩进行了测试,获得了加速度时程曲线以及钢管桩固有频率。
应用推荐