reinforced concrete bridge structures 钢筋混凝土桥梁结构
pre-stressed concrete bridge structures 预应力混凝土桥梁结构
However, creep of concrete and its influence on bridge structures are hard to predict and control. The calculation is very complicated and the results are not accurate.
然而,混凝土的徐变及其对桥梁结构性能影响的预计和控制,是十分复杂又难以获得精确答案的问题。
Particularly suitable for large span bridge structures and cross-section complicated concrete component demoulding.
尤其适用于大跨度桥梁构件及断面复杂的混凝土构件脱模。
Temporary structures are set up to support the formwork when a large concrete bridge with box-section is built.
采用箱型截面的大型混凝土桥梁,其结构施工过程中浇注混凝土需要设置临时支撑结构。
应用推荐