A 28 field component grid model is given showing the relation of computation grid of a field component in ANI-FDTD with its neighboring grids.
分析表明,电磁场分量节点的FDTD迭代计算均涉及到其邻近28个其他场分量节点值。
Job Scheduler tier, which is part of the Compute Grid component, accepts new job submissions, dispatches the jobs to the end points, and provides operational control over the jobs.
作业调度器层是计算网格组件的组成部分,可以接受新的作业提交、为端点分派作业、并提供对作业的操作控制。
All dimensions of contained components refer to how many cells wide and tall each component is within the grid.
所含组件的全部大小是指每个组件在网格内的宽度和高度的单元数量。
应用推荐