Based on ANSYS program, the authors carry out analysis of numerical simulation on large-span structure with stone vault by combining with engineering example.
结合工程实例,基于ANSYS程序对大跨度石穹顶空间结构进行数值模拟分析。
Combining with engineering example, bring up the specific methods of temperature rise from the basic demand, theory calculate, and construction technical measure.
结合工程实例,从砼温度控制基本要求、理论计算及施工技术措施等方面提出温升控制的具体方法。
It is indicated by calculated example that the feasibility analysis method combining precise forecast of wave and wind with strip theory can give satisfactory results for engineering.
计算实例证明,利用波浪预报和切片理论相结合分析运输可行性的方法,可以得到满足工程需要的分析结果。
应用推荐