Based on engineering experience and combined with presently hole-sealed technology of gas drainage used in Tunlan mine, the reasonable hole-sealed length was determined by theoretical analysis.
以工程实验为基础,结合屯兰矿现有瓦斯抽放中封孔工艺,主要针对封孔长度,通过理论分析,确定合理的封孔长度。
This paper combined with the construction experience, analyzes the applications of bamboo glue template in silicon engineering.
结合施工中的经验对竹胶模板在硅工程应用进行了分析。
Abstract: : This paper brings together ideas and experience of management team, combined with the engineering practice compiled regional management scheme.
摘要:本文汇集了小组成员的管理思路及经验,结合工程实践现编制区域管理方案。
应用推荐