The paper describes operation of the detachable zinc melting induction furnace and summaries the practical experience in start-up, routine maintenance and restart at cold state of electric furnace.
叙述了可拆卸式熔锌感应电炉的运行实践,总结了电炉开炉、日常维护、冷炉再启动等实践经验。
The paper introduces the purpose and principle of temperature matching of S109FA unit, analyzes load rejection phenomena of turbine during cold-state start-up, and optimized start-up procedure.
介绍了S109FA机组温度匹配的目的及原理;分析了机组在冷态开机过程中的汽机卸载现象及优化开机程序;最后,介绍了温度匹配法滑参数停机的目的、详细操作步骤、注意事项等。
应用推荐