The critical intensity arrival time is influenced by input flow intensity, coefficient of variation, hump-working load, etc.
临界密集到达时间受到达流强度、变异系数、驼峰作业负荷等因素的影响。
This paper puts forward an optimum method by computing the priority coefficient of each working procedure to limit resources and implement the optimization of the shortest time limit for a project.
提出通过计算各工序优先系数的方法进行资源限定,实现最短工期优化,使该类型的优化从定性优化变成了定量优化,为该类型的优化提供了一个新的求解思路。
Critical load is mainly determined by the number of receiving and departure track and coefficient of variation of hump-working time.
临界负荷主要取决于到发线数量和驼峰作业时间变异系数。
应用推荐