The article introduces the construction technology of center drift method for shallow excavation tunnel in Beijing Metro Line 5, analyses the monitored data for the earths surface.
介绍了北京地铁5号线磁器口车站浅埋暗挖隧道中洞法施工技术,对地表监测数据进行了分析。
Center drift first construction method was adopted in Wushan main tunnel of Fuzhou 961 Civil Air Defence Work, and ground surface deformation was well controlled.
在福州961人防工程乌山主通道工程施工中采用中洞先行的施工方法,地功地控制了地表变形,保证了地表建筑物的正常使用。