Measures dealing with several technical problems often occurred during construction of cast-in-situ concrete piles are expounded based on the construction practice of some projects.
根据几个工程的施工实践,阐述钻孔灌注桩施工中经常发生的几个技术问题的处理措施。
This paper introduces the design principle of cast-in-situ reinforced concrete hollow floor, the design method of side supporting hollow floor, stiffness account and so on.
介绍了现浇钢筋混凝土空心无梁楼盖结构体系的原理、边支承空心楼盖设计原理、刚度计算等方面的问题。
The three-dimensional effects of pile head and applicability of plane-section assumption are main problems in low strain dynamic tests on cast-in-situ concrete thin-wall pipe piles.
现浇薄壁管桩低应变检测时,存在桩头三维效应以及平截面假定的适应性问题。
应用推荐