Measures dealing with several technical problems often occurred during construction of cast-in-situ concrete piles are expounded based on the construction practice of some projects.
根据几个工程的施工实践,阐述钻孔灌注桩施工中经常发生的几个技术问题的处理措施。
Suspension Cast-in Situ Beam construction is to control the construction process and bridge state of internal force and linear, so that the bridge State could fully meet the design requirements.
公路悬浇梁施工监控就是控制施工过程中和成桥状态时结构的内力和线形,以使悬浇梁的成桥状态充分满足设计要求。
Technical thorny problems met during construction of cast-in-situ piles at riprap backfilling area and corresponding countermeasures are expounded to serve as a reference for similar engineering.
介绍爆破抛石回填区域钻孔灌注桩施工中遇到的技术难题,并提出相应的处理措施。对类似工程部位施工有一定的借鉴作用。