casing set-back 套管台
casing set depth 套管下深
set casing 安装套管
set casing Packer 可收回的液压坐封套管封隔器
Casing Outer Set Testing 套管外固定测试
retrievable hydraulic-set casing Packer 可收回的液压坐封套管封隔器
Foam cementing is commonly used for cementing in a shale gas well, while perforation after casing set is often for well completion.
页岩气固井主要采用泡沫水泥固井技术,完井方式以套管固井后射孔完井为主。
Rain water pipe through the walls and floor in accordance with the requirements set casing.
雨水管穿过墙壁和楼板按要求设置套管。
Such as Annulus testing, casing outer set testing, With tubing bundle testing, etc... Not affect normal production in the course of testing.
如环空测试工艺,套管外固定测试工艺,随油管捆绑测试工艺等。在测试过程中对正常生产没有影响。
应用推荐