Taking the bridge in Xinchang railway as example the construction principle, calculation key points and construction process of two supporting points float dragging method are simply introduced.
以新长铁路十九标段太塥运河中桥为例,简要介绍了二支点浮拖法架设钢桁梁的施工原理、计算要点及施工过程。
The calculation and analysis results of key steel structures are obtained. The correctness of the theoretical analysis is verified by mechanical test on some important points of the beam.
得出主要钢结构的计算分析结果,并对其关键部分进行力学测试,验证了理论分析的正确性。
The key points in the calculation of stamping process design were presented, they can serve as references to the design of similar ones.
叙述了冲压工艺设计计算的要点,可供同类模具设计参考。
应用推荐