The design and calculation method of the screwed pile are discussed. The result for load bearing capacity of the pile is verified by both experiment and projects.
初步探讨了确定螺纹桩承载力的设计计算方法,并将螺纹桩的静载试验结果与设计计算结果进行了对比。
The structure and load form of the absorbing tower is complex and regular design and calculation method cannot give its distribution condition of the stress and deformation.
脱硫吸收塔结构及荷载形式复杂,常规设计计算方法不能给出其应力和变形分布情况。
Conclusion the efficiency and accuracy of CMI calculation can be improved through optimizing the classification design and calculating method in computer programming.
结论在计算机程序设计中,通过对分组设计及计算方法进行优化,提高了计算cmi的效率及准确性。
应用推荐