Deferred building is the ability of AXIOM to partially build the object model while the rest of the model is built based the user's needs. The following example illustrates the concept.
延迟构建是指axiom不完全构建对象模型,模型的其余部分基于用户的需求构建。
This paper probes into the concept, attribute, operation base and building model of public logistics information service platform (PLISP) and also gives a solution to PLISP.
文章对公共物流信息服务平台(plisp)的概念与属性、运作基础、建设模式进行了探讨,提出了PLISP的解决方案。
The aeroelastic analysis of a helicopter rotor blade with the controlled oscillating trailing edge flap is presented by building an aeroelastic model of the new concept rotor blade.
通过建立带受控振荡附翼的新概念旋翼气动弹性分析模型,研究了采用受控振荡附翼的直升机旋翼气动弹性特性及其在降低旋翼振动载荷方面的有效性。
应用推荐