building horizontal displacement 建筑物水平位移
The factors relating to shear wall discussed in this paper are seismic intensity, site soil condition, weight and height of building, and top displacement of structure etc.
本文论述了不同设防烈度及场地条件,建筑高度和自重,以及顶点相对位移限值等因素与抗震墙用量之间的关系。
However, the displacement and deformation of surface ground by underground mining have destroyed initial equilibrium between the building and the ground.
但是由于地下开采引起地表产生的移动和变形,破坏了建筑物与地基之间的初始平衡状态。
A planar quadrilateral is adopted as the basic loop in building up the displacement equations, and four basic types of solutions are given.
采用平面四边形为基本封闭形建立位移方程,给出了所有四个基本类型的解。
应用推荐