为此,GA和IAFW跨维度自由世界联合会(Interdimensional Association of Free Worlds),正在执行桥区计划(Bridge Zone Project),将2,213年的时间转移,让扬升到Tara的两个扬升点在2,012到2,017年间同时发生。
基于24个网页-相关网页
A study of the stress and strain distribution of anchorage zone in a long span PC box girder was undertaken in the background of Hangzhou Bay Bridge project.
本文以杭州湾跨海大桥北航道非通航孔桥为工程背景,对大跨度预应力混凝土箱梁锚固区混凝土的应力应变分布特征进行了分析研究。
The type of shear connectors selection test and full-scale model test for the anchorage zone segment of Jintang Bridge, which is under-construction, were the project background.
本文以在建中的金塘大桥的索塔锚固区剪力键选型试验和节段足尺模型试验为项目背景。
应用推荐