Whether the track beam have enough loading ability or not in this kind of case become the key whether the same tonnage bridge crane can be increased.
在这种状况下该轨道梁是否具有足够的承载能力,成为能否增加一台同吨位的桥式起重机的关键。
In this case, there is a new structural measure that setting lengthways stiffened bars under the bridge deck slab in order to improve the loading ability of the bridge deck slab.
在这种情况下,为了提高桥面板的承载能力,在桥面板纵向布置加劲肋成为一种新的构造措施。
应用推荐