An example of dismantling a brick-concrete structure building by blasting method is analyzed, some problems arisen in the process of designing and constructing are illustrated.
从一则砖混结构楼房爆破拆除实例,发现在爆破拆除该类建筑物的设计与实施中存在问题,为此提出改进设计。
The demolition scheme, technological parameters, safety and protection measures of the controlled blasting for demolishing a four-storey framed and brick-concrete structure building are introduced.
本文介绍一座四层框架与砖混混合结构办公楼房的爆破拆除方案、技术参数、爆破安全及防护措施。
The management of a 210 square meters office building, brick-concrete structure.
管理办公楼一栋210平方米, 砖混结构。