The problems of blower control system in Shakou Waterworks, such as failed blower startup, excessive motor startup current and serious motor heating were analyzed.
对沙口水厂风机控制系统在运行过程中经常出现的风机启动失败、电机启动电流过大、电机发热严重等问题进行了分析。
In a coal gas blower set for condensation were incorporated D750 28 blower and speed up hydraulic coupler to adjust load as well as computer control system.
煤气冷凝鼓风机组技术改造选用D750 - 28型鼓风机,采用增速型液力偶合器调节负荷及计算机控制系统。
Combined with the work principle and control target of the blast furnace blower system, the construction and the general design project of the control system are put forward.
结合高炉鼓风机系统的工作原理和控制目标,提出了高炉鼓风机控制系统的结构和总体设计方案。