高炉大修
基于1个网页-相关网页
bf relining
高炉炉役
以上为机器翻译结果,长、整句建议使用 人工翻译 。
The erosion depth in the hearth of No. 8 BF were determined before blow-down in it's 1st relining, and the salamander-taphole was positioned reasonably and the salamander as tapped successfully.
宣钢8号高炉第一代大修时,在停炉前对炉底侵蚀深度进行了计算,并确定了残铁口的位置,使停炉后放残铁取得了成功。
youdao
应用推荐
模块上移
模块下移
不移动