This paper presents the static loading test conducted with 3 piles in the manner of self-balance for the Beijing metro line 5.
介绍北京地铁5号线3根试验桩采用自平衡法进行静载试验的情况。
The article introduces the construction technology of center drift method for shallow excavation tunnel in Beijing Metro Line 5, analyses the monitored data for the earths surface.
介绍了北京地铁5号线磁器口车站浅埋暗挖隧道中洞法施工技术,对地表监测数据进行了分析。
The references of Trainguard MT in China include Guangzhou Metro line 4 and 5, as well as the recent order from Beijing line 10 and the Olympic Branch line.
Trainguard MT在中国的应用例子则有:广州地铁4号线及5号线,以及最近来自北京地铁10号线及奥运支线的订单。
应用推荐