河床质粗化
基于1个网页-相关网页
armoring of bed material 床沙粗化
·2,447,543篇论文数据,部分数据来源于NoteExpress
The river channel change, the bed load and bed material armoring, and the water level lowering after the operation of the Gezhouba project are analyzed based on the topographic and hydrologic data.
根据实测地形和水文泥沙资料,分析了葛洲坝枢纽运用后宜昌河段的河床冲淤变化、推移质和床沙的粗化以及枯水位的变化。
youdao
应用推荐
模块上移
模块下移
不移动