According to confirmed conclusion, project team shall, based on actual situation, choose one the following ways and then carry it out.
依据确认结论,由项目小组视情况选择以下处理方式之一后执行。
Based on actual situation of power grids, the authors propose the concept of transmission cross-section and that of time transmission cross-section.
根据电网输电的实际情况提出了输电断面和时间输电断面概念。
Finally, based on actual situation of our country, some suitably suggestion for our country are supplied, in order to safeguard nuclear power plant in earthquake.
最后结合我国PS A的研究进展、SPSA的基础等实际状况,提出适合我国的SPSA实施路线的建议,以保障核电站地震情况下的安全。
应用推荐