The widened section, usually concrete, at the base or bottom of a foundation wall, pier or column.
被加宽的部分,通常是混凝土,在基础墙壁,柱桩或支撑柱体的基础或底部。
In the railway engineering, the method of cofferdam construction is usually adopted in the bridge base, pier and abutment in deep-water.
铁路工程中,深水处的桥梁基础、墩台多采用围堰施工。
The paper introduced type of level force of flexible pier base, how to calculate perfect temperature force, brake force, how to analyze non-perfect condition, and the noticed problems in the design.
本文介绍了墩台承受水平力类型,理想情况温度力、制动力如何计算,非理想情况如何简化分析,以及设计中注意的问题。
应用推荐