Participatory evaluation method is introduced to interpret the background and process which produce those outputs in descriptive analysis and make the results more convincing.
参与式评估法用来解释描述性分析结果的产生背景和过程,使结果更具有说服力。
The thesis is composed by five parts, which are research on the background, basic theory, classification and evaluation of resources, analysis of exploiting models and Suggestions.
本文共分五大部分,即背景研究、基础理论、资源分类评价、开发模式分析以及对策建议。
This paper puts forward the engineering geological evaluation of seismic risk of Jiaozuo-Hebi mine areas by the analysis of seismic geological background and finite clement calculation.
本文通过对地震地质背景分析和数学有限元计算,最后提出对焦作-鹤壁矿区地震危险性工程地质评价。
应用推荐