So in such a formation construction, it is important to use the technology of drilling mud back to tank to balance the pressure of the loose layer and prevent the borehole collapse.
所以在这种地层中施工,利用泥浆回灌钻孔技术有效地平衡松散层压力不使其垮塌尤为重要。
The gravity retaining structures depend on the wall tare weight to balance the earth pressure generated at the wall back.
重力式支挡结构是一种依靠墙身自重平衡墙后土体产生土压力的挡土结构。
The balance extension tube functions to retain balanced pressure in front and at the back of the cleaner prior to the opening of the valve to prevent it from impacting the valve core.
发球筒平衡接管的作用是在通球初始时,出球接口端的阀门未开启前使清管器在发球筒中处于前后压力平衡,不能撞向阀芯。
应用推荐