Sleeve axis is always perpendicular to railway sleepers, ensuring quick and accurate alignment. The average working efficiency is 1.5 times that of double end wrench.
套筒轴线始终垂直于轨枕面,对位快速、准确,平均工作效率为双头的1.5倍。
In engineering, line Balancing Rate is the quota that measures the average situation of every cycle time in working procedure and the production efficiency on processing line.
在工业工程中,生产线平衡率是衡量生产线各工序作业时间平均化状况以及生产线生产效率的指标。
The average Hospitalization days of patients are the key indication which reflects the working efficiency of a hospital and its combined benefits.
平均住院日是反映医院工作效率、医院综合效益的关键指标。
应用推荐