... as-built drawings 竣工图 ; 竣工图纸 ; 竣工图则 ; 竣工图;竣工图 as the built drawings 完成图 as-built drawings and documentation 竣工图纸资料 ...
基于4个网页-相关网页
As-built drawings shall be submitted within 60 days after the Start-up tests are completed.
竣工图应在启动测试完成后的60天内呈递给所有人。
The as-built drawings of our golf courses are fascinating for me to look at, because at first they don't seem to make much sense.
在做好的图纸上面看我们的高尔夫球场,对我来说是非常迷人的,但是一开始其并没有多大的意义。
This further elaboration of the deliverables is captured in as-built drawings, and final operating adjustments are made during testing and turnover.
这些特征的逐步完善最终都反映在竣工图中。在检测和移交阶段,通常还以最终运行调整的形式进一步完善这些特征。
应用推荐