Job Analysis Schedule 工作分析计划表
Schedule analysis 施工进度分析 ; 进度分析
Cash Flow Schedule Analysis 现金流量表的分析
life-span schedule analysis 寿命表分析
Schedule Risk Analysis 进度风险分析
schedule ability analysis 可调度性分析
If the estimated schedule is too long, customers and bosses will pressure you to shorten it — not because of flaws in your analysis but simply because they want it to be shorter.
如果你给出的预计开发时间太长,你的客户或老板可能会对你施加压力,希望你缩短开发日程。这不是因为你的分析预测有任何瑕疵,而只是因为他们希望在更短的时间内完成。
Specifically, they focus on preparing data for analysis — the task that usually accounts for 80 percent of the schedule for most data warehouse projects.
将特别关注为分析准备数据——该任务通常占大多数数据仓库项目计划的80%。
It will explore using a visually guided, directory-based (tree-based) editor and steps to create, edit, schedule the emulation, and get analysis reports.
它将探索一个视觉指导的、基于目录的(基于树形结构的)编辑器和步骤来创建、编辑、确定评价时间、并且获得分析报告。
应用推荐