This paper studies an integral programming model of production schedule in rayon factory, presents the method of solution and application example.
本文给出了人造丝厂生产作业计划整数规划模型、求解方法和应用实例。
In this paper, an optimal mathematical model solving method, the successive approximation method, of the nature of nonlinear integral programming problem is suggested.
本文提出一种求解优化数学模型,属于非线性整数规划问题的方法——逐次近似法。
应用推荐