... 帧内刷新(Intra Refresh) 全零输入测试(All Zero Test) 临近 DC倒置测试(Near-DC Inversion Test) ...
基于20个网页-相关网页
The result register will be non-zero (or, true, all bits set to one) if the previous test for zero was true.
如果之前是否为零的测试的结果为真,那么结果寄存器将是非0(为真,所有位均被置1)。
Valve with the valve sealing surface through precision grinding, assembly, after 100% completion of pressure test, all to achieve zero leakage.
阀瓣与阀体密封面经过精密研磨,组装完毕经过100%试压,全部达到零泄漏。
应用推荐