The best way to tackle the challenges of growing large topologies in an enterprise is by taking the time to document all the decision points and the trade offs that are acceptable.
应对企业中不断增长的大型拓扑这一挑战的最好办法是花时间记录所有决策点和可接受的折衷方法。
Management needs to be able to analyze inventory levels, cycle time, wait time, throughput, equipment and personnel utilization, and many other factors at all points in the process.
管理人员需要能够分析库存程度、周期时间、等待时间、产量、设备和人员利用率,以及流程各个方面所涉及的许多其他因素。
We write our requirements so that they always describe what is required over all points in time, as in the "all inclusive" method.
我们书写需求,以便它们总是能够描述在任何时间上被需要的事情,正如“包含一切”的方法中的一样。
应用推荐