Actual operating results show that the method, the introduction of improved coal bucket wheel control is effective and robust, with good results.
实际运行结果表明,该方法的引入提高了斗轮取煤控制的有效性和鲁棒性,具有良好的效果。
The times required for control of pressure and temperature as well as actual values of pressure, temperature, and vacuum can be input at the PC-terminal at the central operating desk.
压力及温度控制所需时间以及压力,温度和真空度的实际值可被输入在中央操作台上的PC机终端。
The actual operating results show that this design is feasible, the control performance and reliability of electrical equipment are improved.
实际运行结果表明,这种设计是可行的,提高了电气设备控制性能及可靠性。
应用推荐