acidizing g of well 井的酸处理
The results show that with the fracture cleaning and acidizing, the productivity of the well has been greatly improved.
施工结果表明,通过裂缝清洗和酸化改造,该井产能得到了较大程度提高。
Pitting problem of oil pipe caused by diluted acid after oil well acidizing was solved by using acidizing inhibitors.
解决了油井酸化施工后乏酸对油管的点蚀问题。
The result of simulation can directively be applied for models calculating the productivity of a horizontal well, which can predict the productivity after acidizing treatment.
这个数值化的酸岩反应模型可以与酸注入模型进行耦合求解,同时,数值模拟的结果可以直接提交水平井产能模型,进行水平井酸化后产能预测。
应用推荐