A major obstacle in production information integration of network based manufacturing is that the flow of information models between various design softwares is difficult.
在网络化制造中进行产品信息集成的一个重要障碍就是设计软件之间的信息模型的流动困难。
A scheduling model, with the objective of minimizing the average WIP (work in Process) level, is built based on the fluid network model of semiconductor manufacturing systems.
在半导体制造系统流体网络模型的基础上,建立了以减小平均在制品水平为目标的可分解的优化调度模型。
A new method based on artificial neural network to calculate the developed length quickly is proposed according to many data accumulated during experimenting and manufacturing.
针对工厂积累的大量生产和实验数据,提出一种基于人工神经网络计算弯曲件板料展开长度的方法。
应用推荐