The visual simulation method for high RCC arch dam construction based on the GIS was presented.
提出了基于GIS的高碾压混凝土拱坝施工可视化仿真方法。
参考来源 - 高碾压混凝土拱坝施工过程仿真与优化研究·2,447,543篇论文数据,部分数据来源于NoteExpress
为龙滩高碾压混凝土重力坝设计和施工提供了重要的参考依据。
It provides important reference for Longtan high RCC dam design and construction.
研究结果对高碾压混凝土坝的连续、快速施工具有实际应用价值。
The study results have important practical values in the course of high …
研究工作针对龙滩高碾压混凝土重力坝设计的需要,其成果为即将开工的龙滩工程建设提供了重要的参考依据。
Aimed at the design demand of high RCC gravity dam for Longtan project that is about to start, the results of studies will provide the important reference basis.
应用推荐