高水头电站一般采用冲击式水轮发电机组,引水系统长,容易产生水压波动。
The impulse turbine unit is normally used in high water-head power stations, whose diversion system is long and is likely to cause pressure fluctuation.
在高水头电站、抽水蓄能电站设计中,需要查明岩体在实际水头作用下的透水率、渗透特性。
In design of pumped storage station or high water head hydro-power station, it is important to evaluate the rock infiltration properties under practical water pressure.
小湾水电站泄洪洞在泄洪时具有高水头、高流速、泄量大的特点,对混凝土冲刷力强,容易产生空蚀破坏。
As the high head, high velocity and large flow of flood discharge, the concrete of spillway tunnel in Xiaowan Hydropower Station is easy to be damaged by cavitation.
应用推荐