最后从地应力角度,讨论地下厂房的轴线选择和高压隧洞衬砌设计方案。
Finally, the selection of underground power house axis and the lining design scheme for the pressure tunnel are discussed based on the in-situ stress.
该计算方法较好的反映了水工高压隧洞的内水外渗后实际受力变形情况。
The calculation method can preferably reflect the actual stress and strain situation of hydraulic tunnel with high pressure with seepage from inner tunnel to outer tunnel.
将内水压力以体力的形式作用于隧洞衬砌和围岩,建立了高压隧洞内水外渗渗流场与应力场的耦合数值分析的计算模型。
The inner water pressure is applied to the lining block and surrounding rock as physical force, and the coupled analysis model of seepage field and stress field is formed.
应用推荐