评审人员,将供应商提出的建议要求记录在经认可的设计报告中,并将详情提交给管架集团工程总监(PSG)评审和验收。
The reviewer will consider the implications of the proposed deviation on approved design reports and in such instances will forward details to the PSG Engineering Director for review and acceptance.
顺利完成这些检测后,买方须在出厂设备验收证上签字,证明业已完成检测,并注明双方认可的,且应由公司在买方同意的期间内校正的缺陷。
After the signing of the Plant Acceptance Certificate by the Purchaser, Corporation shall dismantle and pack the Equipment for surface shipment to Purchaser's Facility.
即使由于业主检验师的疏忽和失误导致工作或材料的验收,有缺陷的工作或材料也不能被认可和接受。
Any omission or failure on the part of the Owner's inspector to disapprove or reject any work or materials shall not be construed as an acceptance of any defective work or materials.
应用推荐